Conoco Phillips

Conoco Phillips
Client: Conoco Phillips
Anord Value: Excess of 500,000
Anord Program: 12 Weeks

Scope of Supply

Working with global EPC specialist Jacobs Engineering and their client Conoco Phillips, Anord were selected to design and build a power distribution centre comprising of 3.3 kV switchgear, 400V Package Substation, intelligent MCC and UPS system, contained in a dedicated modular switchroom. Due to the nature of the project delivery program, the entire scope was successfully delivered 12 weeks following design kick off and following arrival on site, the modular switchroom was placed in situ within 3 hours. This enabled completion of the power and process cabling and plant start-up to be achieved on program.